Installation and operation steps of vacuum packaging machine

Installation and operation steps of vacuum packaging machine

Installation steps of vacuum packaging machine:

1. Open the upper cover of the packaging box of the vacuum packaging machine, and then remove the four side plates of the packaging box;

2. Disassemble the vacuum packaging box and check whether the mechanical products in the packaging box are obviously damaged;

3. Take out the main body of the vacuum packaging machine and place it on a stable ground;

4. Remove the protective film packaged on the main body of the vacuum packaging machine;

5. Insert the supplied power plug and foot switch plug into the corresponding sockets.
Back to blog

Leave a comment